Reopening of the Carranza Bridge

Puente de Carranza

On September 26th , the reopening of the Carranza Bridge in Cádiz took place.

The bridge has been under construction since last May, with the goal of making it lofty allowing ships get access to the Shipyard.

Our company Fernández Jove Comercial y Ingeniería carried out the design and (hydraulic and electrical) installation of the two piles that allows the bridge to be lifted.

A work in a sector where the company had never participated, ends with great success, supporting the entry of ships into the Navantia Shipyard.

Leave a Reply

Your email address will not be published. Required fields are marked *